It's been difficult on me and the girls the past two days. I have them in the kitchen area with gates up when I'm in there, but when I go upstairs I have to take them with me or they have a fit. I think because of the noise and such. The guys come back Monday to set the tile, but Tuesday is going to be rough. They will pull out the carpet and chip out the tile in the entry way, and our entry was is not small. It's 15 feet by 8 ft..with two steps at each end. (one end going down into the living room to the right and the other end going down into the breakfast room. Were having the stairs done too, plus the upstairs hall and computer/play-room. It will take them three to four days to complete and the girls and I will have to hold up in the kitchen breakfast area. Sunday we have to take everything out of the living room and computer/play room. Things are already dusty and messy. I don't do well with messes and dirt, so this is hard and going to get even harder on me. Yuk! |