Hi All, I miss being on YT and only get to check in every once in a while.
My kitchen remodel is progressing, but slower than expected. At this point, everything has been removed right down to the studs, and we are dealing with tile, electrical, plumbing, etc.; my new teak cabinets are gorgeous, although they are sitting in my living room, new appliances are in my family room. Without a kitchen for 2 weeks has been like camping... I have the microwave, a toaster oven and BBQ, so we survive ok
While waiting through many delays, my contractor helped me empty out 22 years of accumulated stuff in my garage, put up sheet rock, and put new white cabinets out there. Hard work, but amazing.
If all goes well I will have my new kitchen about a week before Thanksgiving. Keeping fingers crossed as Monday they are drilling down through concrete to install 4 steel posts to hold up the large granite bar top.... and hope we don't hit unknown water or electrical lines.
Biggest bonus of all...... the love relationship with my contractor/boyfriend has continued to grow, and we are soooo happy. Hey if we can survive remodeling together while living in this house, so early on...... that's a good sign that we can survive anything.